St. Luke’s School – Athletic Center Refresh
NEW CANAAN, CTDesigner: Whalen Berez Group
Project Budget: $500,000.00
Project Cost: $475,000.00
Timeline: 8.5 months
Publish Date: 2025-01-31
Author: Giana Castelli
Knowledge
St. Luke’s School Athletic Center Refresh – The WBG completely re-designed the existing athletic center to be a bright & inviting student space with new flooring, paint, furniture, and wall graphics.
Project Needs
- Execute an interior refresh for St. Luke’s Athletic Center to excite students and athletes, create a lively environment with student seating, energetic colors, and millwork.
- Spaces include: entry lobby, two fire stairwells, administrative wing, two locker room corridors, squash mezzanine, and one small vestibule entry.
- All work to be completed within a $500,000.00 budget!
Specialty Requests:
- Cover existing unsightly fire panels in main lobby
- Give two existing three-story fire stairwells a major facelift
- Employ different types of wall graphics, school branding, signage, and photography
Key Points
Interior
All interior design, custom architectural millwork, custom wall graphics, project management, procurement, and installation was provided by the WBG.
Budget
Executed the project $25,000 under budget.
Design
All design work was completed in a 6 month period with a 2.5 month installation window.